502 Main Project
Customer: Black River Holdings LLC
Location: Lake Norden, SD
Duration: 13 months
Sentry Divisions Utilized: Project Management
Black River Holdings hired Sentry as the General Contractor for the construction of their large, multi-use office building in Lake Norden, SD. A Project Manager was assigned and coordinated all subcontractors, logistics, owner updates, and scheduling.
Sentry’s Electrical department executed a design build process, both engineering and wiring the building. South Dakota Service performed the steel erection as well as Sentry-manufactured-accessory installation and crane work. The three-story steel/wood framed building serves as Black River’s corporate headquarters, contains 11 apartments, and has commercial retail space on the entire ground floor.