No two projects look exactly alike, and neither do the days behind them.
From crews working in the field to the teams planning and coordinating each step, there’s a lot happening across Sentry. Our latest video brings together a few of those moments and the people who keep the work moving forward.
Around Sentry
Here are a few recent updates from projects where our teams have been putting their experience to work.

NORTH DAKOTA | WATER INFRASTRUCTURE
Mandaree Water Treatment Plant
The new treatment facility brings together pumping, filtration, process piping, electrical, and controls work. At our last project update, construction was approximately 94% complete, with a substantial completion walkthrough planned for December 2026.

STORM LAKE, IOWA | SOUTH DAKOTA SERVICE
Buena Vista Regional Medical Center
Our South Dakota Service team has been erecting structural steel for the new Medical Office Building. The project has involved more than 250,000 pounds of structural steel, bringing together skilled fieldwork and careful coordination.

SOUTH DAKOTA | ELECTRICAL DIVISION
Waverly-South Shore School
From panels and wiring to lighting and finish details, our Electrical Division’s work supports the spaces students and staff use every day. It’s a look at the important details that go into bringing a facility together.

BROOKINGS, SOUTH DAKOTA | MECHANICAL DIVISION
SDSU Student Union
Our Mechanical Division is retrofitting welded carbon-steel glycol piping as part of Phase 1 of the Student Union’s chiller upgrade. It’s important work that often happens out of sight but plays a key role in the facility’s mechanical systems.
Different teams. Different kinds of work. All part of what makes Sentry move.
Explore the experience and services behind our projects, or connect with our team to learn more about what Sentry can do.
Have a project in mind?
Connect with our team.
Flexible. Innovative. Results.
